2-Auxilliary Spillway
3-Emergency Spillway
4-Compensatory outlet
250 m
25 m
48 m
Total volume of excavation
227 000 m3
Total volume of concrete placement
676 000 m3
234 m
21 m
27.8 m
175 300 m3
48314 m3
551.5 m
12.6 m
14
concrete
8
64.75 m
5.32 m
Main access road of the site
10
33
Permanent concrete bridge
12
115
Pre-stressed concrete box
Substitute road of Karun 3
7.2
First bridge
11.8
336
Steel
Second bridge
214
1. Permanent exhibition 2. Mosque3. Restaurant and super-market4. Green space and parking space