Body specifications
 
Item
Quantity
Dam type Double arc concrete
Height from foundation 205 m
Crest length 462 m
Crest width 5.5 m
Foundation width 29.5 m
Total volume of the body 1.3 million m3
Total volume of concrete placement 1.3 million m3
 
 
Water sealing specifications
 
Item
Quantity
Sealing method Grouting curtain
Total length of grouting for sealing curtain 436.5 km
Total length of grouting tunnels 2423 m
Depth of grouting curtain 100 m
 
Body specifications
Reservoir specifications
Item
Quantity
Total volume of reservoir 3000 million m3
Area of reservoir 48 km2
Length of dam lake 60 km
Width of dam lake 3000 to 2000 m
Normal level +845 masl
Reservoir specifications
Diversion system
Item
Quantity
Numbers of diversion tunnels 2
Length of diversion tunnels 613 and 536 m
Tunnel diameter after lining 13 m
Total excavation volume 229 000 m3
Cross section U shape and circular
Type of lining Concrete
Tunnel excavation diameter 15 m
Discharge capacity 3250 m3/s
Type and height volume of upstream cofferdam Rock-fill, 35 m and
3.5 million m3
Diversion system
Instrumentation
In Karun 3 Project different types of instrumentations have been used in different structures. Some of them are installed at the time of construction including thermocouple, thermometer, and inclinometers of dam body as well as extensometer and pressure-meters of power house. Other instrumentations are installed in different stages of progress considering the pre-requisites of water filling. In the course of water filling these instrumentations are read on a daily basis.
The said instrumentations are purchased from Swiss Company of Hagenburger. They all have high quality and at the time being all instrumentations installed in dam body are very well monitoring the behaviors of body, abutments and grouting curtain.
Instrumentation
Spillway
In Karun 3 Project three types of spillways and one compensatory outlet are considered whose specifications are as follows:
 
1-Service Spillway
 
Item
Quantity
Type of spillway Gated
Numbers of intakes 2
Location Right abutment
Type of gates 2 Radial and 2 stop-log gates
Numbers of gates 4
Length of chute 94 and 57 m
Width of chute 19.5 and 22.5 m
Discharge capacity 8710 m3/s
Diameter of gates 15 by 17.34 m
Concrete placement volume 50 000 m3
Length of stilling basin 400 m
Width of stilling basin 35 to 72 m, average 56 m

2-Auxilliary Spillway

 
Item
Quantity
Type of spillway Free
Location On dam body
Length of crest 54 m
Intake shape OG
Maximum height of water 5.6 m
Discharge capacity 1500 m3/s

3-Emergency Spillway

 
Item
Quantity
Type of spillway Gated
Location Half of the height of dam
Numbers of intakes 2
Type of gates 2 radial and 2 stop-log
Numbers of gates 4
Elevation of gates axis 760 m
Discharge capacity 2800 m3/s

4-Compensatory outlet

 
Item
Quantity
Numbers of outlets 2
Approximate length 32 m
Diameter 2.2 m
Type of lining Metal
Types of gates Ros and emergency gates
Types of valves Valve with fixed cone
Axis elevation 730 masl
Maximum discharge capacity 250 masl

 

Spillway
Quarries and their specifications
Quarries of Karun 3 Project includes the materials taken from excavations of abutments, dam foundation, stilling basin and A& B quarries in Dehriz, Tangghaf, Rokat, Bajul, and Shalu quarries in 7 to 15 km distance of Karun River, upstream of dam.
Quarries and their specifications
General specifications of powerhouse
Item
Quantity
Type of powerhouse Underground
Location 500 m down of right abutment
Capacity 2280 MW
Average annual generation 4172 million kw/h
Turbine type Francis with vertical axis
Operation level Minimum critical +800
Normal +845
Maximum +850
General specifications of powerhouse
Specifications of powerhouse equipments
Item
Quantity
Numbers of turbines 8 units
Power of each turbine 250 MW
Maximum output 94%
Height of turbine design 161 m
Turbine manufacturer Harbin of China
Numbers of transformers 8 units
Nominal power of each transformer 263 MVA
Nominal voltage of each transformer 187.5 KV
Rotation speed of generator 187.5 rotations/minute
Generator manufacturer Elin of Austria
Transformer type Synchronic with vertical axis
Design discharge of each unit 172 m3/s
Specifications of powerhouse equipments
Specifications of powerhouse building
 
1-Powerhouse cavern:

Length
Width
Height

250 m

25 m

48 m

Total volume of excavation

227 000 m3

Total volume of concrete placement

676 000 m3


 
2-Transformer cavern:

 
Length
Width
Height

234 m

21 m

27.8 m

Total volume of excavation

175 300 m3

Total volume of concrete placement

48314 m3

 
Specifications of powerhouse building
Specifications of powerhouse outlet tunnels
In this regard no data exists.
Specifications of powerhouse outlet tunnels
Specifications of powerhouse waterways
In this regard no data exists.
Specifications of powerhouse waterways
Technical specifications of post and switchyard
Specifications of switchyard and 400 kv transfer lines
Post voltage 400 kv
Arrangement type Double with 1.5 key arrangement
Numbers of B 4 from power house direction and 5 outlet feeders
Water transfer tunnels
Length of water transfer tunnel

551.5 m

Diameter of intake transfer tunnel

12.6 m

Diameter of outlet transfer tunnel

14

Type of lining

concrete

Numbers of intake penstocks

8

Numbers of outlet penstock

8

Length of each penstock

64.75 m

Average diameters of penstocks

5.32 m

Technical specifications of post and switchyard
Specifications of tunnels
In this regard no data exists.
Specifications of tunnels
Intake structures
 
Item
Quantity
Numbers of intake 3
Maximum design discharge each intake 750 m3/s
Design head 86 m
Numbers of gates 24 for each intake
Type Stop-loge
Gate of intake structure Stop-log
Width of gate 9.5 m
Height of gate 33.6 m
Intake structures
Outlet structures
 
Item
Quantity
Numbers of intake 2
Design head 25.22 m
Numbers of gates 10 for each intake
Type Stop-loge
Width of gate 13.75 m
Height of gate 15.887
Outlet structures
Access roads and bridges
1- Technical specifications of access roads
 
Name of the road
Average width (m)
Length (km)

Main access road of the site

10

33

 
 
2- Technical specifications of the bridges
 
Name of the bridge
Width (m)
Length (m)
Type of structure

Permanent concrete bridge

12

115

Pre-stressed concrete box

 
 
3- External access roads
 
Due to water filling of Kaun 3 dam approximately 7300 m of Ahwaz-Sharekord road submerged. Therefore substitute road of Karun 3 was constructed on a level higher than the maximum level of Dam Lake. This road includes two concrete arc bridges and four tunnels with the following specifications:
 
 
 
Name of the road
Average width (m)
Length (km)

Substitute road of Karun 3

12

7.2

 
 
Name of the bridge
Width (m)
Length (m)
Type of structure

First bridge

11.8

336

Steel

Second bridge

11.8

214

Steel

 
 
Access roads and bridges
Complementary operations
• Building Karun 3 residential complex with an area of about 25000 km2, including 20 residential apartments, six four-story buildings with 54 apartments in Izeh Town.
• Complementary buildings of the Project including six 1-3 bedroom apartments at site.
• Building Karun 3 sport complex.
• Building Karun 3 recreational and exhibition complex including:
1. Permanent exhibition
2. Mosque
3. Restaurant and super-market
4. Green space and parking space
Complementary operations

Visit: