1- Technical specifications of access roads
| Access road from Chalus road to upstream dam |
8 |
1499 |
| Access road to bottom outlet from upstream dam crest |
8.7 |
1171 |
| Access road to surging tanks through upstream dam crest |
10.5 |
3000 |
| Access road to entrance of bottom outlet through upstream dam crest |
11 |
878 |
| Access road to intake gates chamber through upstream dam cerst |
|
|
| Access road to Daryabak Complex from Chalus road |
7 |
2365 |
| Access road to dam crest from Daryabak road |
10 |
380 |
Access road to area of GIS post This road continues to admin building and then to entrance of main access tunnel This road is the continuation of access road to dam crest |
7.9 |
750 |
| Connection road between the downstream and upstream dams This road passes near the entrance of main access tunnel and ends to the access road to surging tank of upstream dam |
7 |
4030 |
| Access road to AGC |
7 |
1000 |
| Access road to NAG |
7 |
1800 |
| Access road to middle access gallery to pressure shafts (Intermediate Adit) |
1 |
1700 |
| Access road to surging tanks |
7 |
4030 |
| Access road to substitute chamber in waterways |
7 |
520 |
| Access roads to consultant and client offices |
7 |
550 |
| Access road to contractor office (Joint B) |
7 |
1200 |
| Access road to entrance of bottom outlet through downstream dam crest |
6 |
500 |
| Access road to exit of bottom outlet through downstream dam crest |
|
|
2- Technical specifications of the bridges
| The bridge on chute of upstream dam |
7.5 |
21.6 |
Metal with concrete lining (Composite) |
| The bridge on chute of downstream dam |
6.2 |
31.5 |
Metal with concrete lining (Composite) |
| The bridge on Garmrudbar river |
8 |
62 |
Metal with concrete lining (Composite) | |