Sarrud Power Plant
History and background
The studies were carried out Jihad Ministry
Commencement of construction activities: 1985
Operation commencement: 1987
Targets
  • Annual generation of 0.34 million kwh of energy
Location
The project is located in 59°42¢ of geographical latitude and 36°48¢ of geographical longitude in Khorasan Province, Kalat Naderi City
Technical Information

  • Diversion dyke
    Type: Stone
    Spillway height: 2.5 m
    Spillway length: 15 m
  • Water transfer channel
    Type: Stone
    Length: 600 m
    Dimensions: 0.6*1 m
  • Forebay:
    Volume: 150 m3
    Dimensions: 6.25*4*6 m
  • Penstock
    Type: Steel
    Numbers: 1
    Diameter: 0.5 m
    Length: 40 m
  • Powerhouse
    Type: Current On-the-ground
    Building: Stone structure with the dimensions of 4.2*5*7 m
    Total design discharge: 0.5 M3/s
    Head: 16.6 m
    Installation capacity: 0.065 MW
    Network type: Isolated
    Turbine type: Banki
    Numbers of units: 1
  • Outlet channels
    Type: Reinforced concrete
    Dimensions: 1*13.5 m
 


Visit: