Ardeh Power Plant
History and background
The studies were carried out by Jihad Ministry
Commencement of construction activities: 1986
Operation commencement: 1989
Targets
  • Annual generation of 0.42 million kwh of energy
Location
The project is located in 37°34¢ of geographical latitude and 48°22¢ of geographical longitude in Gilan Province, Rezvanshahr City, Aredh Village
Technical Information

  • Diversion dyke
    Type: Concrete
    Spillway height: 1.5 m
    Spillway length: 68 m
  • Forebay:
    Volume: 150 m3
    Dimensions: 2.8*5.1*10.6 m
  • Penstock
    Type: Steel
    Numbers: 1
    Diameter: 0.4 m
    Length: 512 m
  • Powerhouse
    Type: Current On-the-ground
    Building: Concrete structure with the dimensions of 4.7*8*9 m
    Total design discharge: 0.15 M3/s
    Head: 115 m
    Installation capacity: 0.125 MW
    Network type: Isolated
    Turbine type: Poltan
    Numbers of units: 1
  • Outlet channels
    Type: Reinforced concrete
    Dimensions: 1.5*7.5 m
 