Prepared Projects for Investment

  Investment

Major Hydropower Projects

Being Operated

  Karun 3

  Karun 4

  Karkhe

  Gotvand

  Masjed Soleiman

Being Executed

  Bakhtiari

  Rudbar Lorestan

  Irrigation and drainage network of Chamshir

  Sarney

  Siahbishe

  Seimare

  Khersan3

Being Studied

  Aras Watershed

  Dez Watershed

  Zohre-Henijan

  North Watershed

  Ghezel Ozan

  Karun Watershed

  Karkhe Watershed

Small and Medium
Hydropower Projects

 Being Operated

 Being Executed

 Ready For Construction

 Ready For Investment

RSS
Modify settings and columns
 Aras
Name of the Project: Current Aras (Concrete)Phase 1
Reservoir Volume (Million M3): 5000Capacity: 264 Annual Energy Generation (Gwh): 800+825
 Dez
Name of the Project: Reservoir Zalaki (Concrete Double arc)Phase 1
Reservoir Volume (Million M3): 1517Capacity: 466 Annual Energy Generation (Gwh): 1333
Name of the Project: Reservoir Liro (Concrete Double arc)Phase 1
Reservoir Volume (Million M3): 520Capacity: 324 Annual Energy Generation (Gwh): 1025
Name of the Project: Current Sezar 4-1 (Concrete)Phase 1
Reservoir Volume (Million M3): -Capacity: 265 Annual Energy Generation (Gwh): 1020
Name of the Project: Current Dez 3-1 (Concrete)Phase 1
Reservoir Volume (Million M3): -Capacity: 930 Annual Energy Generation (Gwh): 2198.2
 Ghezel Ozan
Name of the Project: Reservoir Pir Taghi (RCC)Phase 1
Reservoir Volume (Million M3): 500Capacity: 240 Annual Energy Generation (Gwh): 630
Name of the Project: Reservoir Namhil (Rock-fill)Reconnaissance
Reservoir Volume (Million M3): 4159Capacity: 496 Annual Energy Generation (Gwh): 1370
Name of the Project: Reservoir Paveh Rud (Rock-fill)Reconnaissance
Reservoir Volume (Million M3): 1593Capacity: 250 Annual Energy Generation (Gwh): 905
 Karkhe
Name of the Project: Reservoir Garsha Godar Pir (Rock-fill)Phase 1
Reservoir Volume (Million M3): 1557Capacity: 200 Annual Energy Generation (Gwh): 588
Name of the Project: Reservoir Kuran Buran (Rock-fill with clay core)Phase 1
Reservoir Volume (Million M3): 4022Capacity: 284 Annual Energy Generation (Gwh): 6388
Name of the Project: Reservoir Tang Mashure (Concrete Double arc)Phase 1
Reservoir Volume (Million M3): 1629Capacity: 167 Annual Energy Generation (Gwh): 296
Name of the Project: Reservoir Sazbon (Concrete arc)Phase 1
Reservoir Volume (Million M3): 1600Capacity: 375 Annual Energy Generation (Gwh): 572
Name of the Project: Current Karkhe 2 (Weight concrete)Phase 1
Reservoir Volume (Million M3): 132Capacity: 118 Annual Energy Generation (Gwh): 205
Name of the Project: Current Sazbon Jadid (Axis 2) (Concrete arc)Reconnaissance
Reservoir Volume (Million M3): 280Capacity: 300 Annual Energy Generation (Gwh): 728
 Karun
Name of the Project: Reservoir Kalat (Concrete Double arc)Phase 1
Reservoir Volume (Million M3): 2660Capacity: 292 Annual Energy Generation (Gwh): 544
Name of the Project: Reservoir Khersan 2 (Concrete Double arc)Phase 1
Reservoir Volume (Million M3): 2304Capacity: 580 Annual Energy Generation (Gwh): 1689
Name of the Project: Reservoir Khersan 1 (Concrete)Phase 1
Reservoir Volume (Million M3): 1291Capacity: 2638 Annual Energy Generation (Gwh): 1219.2
Name of the Project: Reservoir Bazaft (Concrete Double arc)Phase 1
Reservoir Volume (Million M3): 450Capacity: 240 Annual Energy Generation (Gwh): 750
Name of the Project: Reservoir Karun 3 (Axis 3) (Rock-fill)Phase 1
Reservoir Volume (Million M3): 3213Capacity: 1458 Annual Energy Generation (Gwh): 3027
Name of the Project: Reservoir Karun 5 (Rock-fill)Phase 1
Reservoir Volume (Million M3): 2013Capacity: 560 Annual Energy Generation (Gwh): 970
Name of the Project: Current Karun 2 (Axis 8) (Concrete double arc)Phase 1
Reservoir Volume (Million M3): 198Capacity: 1000 Annual Energy Generation (Gwh): 2251
Name of the Project: Pump storage Ilam (CFRD)Phase 1
Reservoir Volume (Million M3): 4Capacity: 1000 Annual Energy Generation (Gwh): 1460
 North
Name of the Project: Current Namarestagh (Weight concrete)Phase 1
Reservoir Volume (Million M3): 0.45Capacity: 33.5 Annual Energy Generation (Gwh): 902
Name of the Project: Current Sardabrud (Weight concrete)Phase 2
Reservoir Volume (Million M3): No reservoirCapacity: 20 Annual Energy Generation (Gwh): 85.94
Name of the Project: Current Golestan (Weight concrete)Phase 2
Reservoir Volume (Million M3): No reservoirCapacity: 5.6 Annual Energy Generation (Gwh): -
 Zohre-Henijan
Name of the Project: Reservoir Hajghalandar (RCC)Phase 1
Reservoir Volume (Million M3): 750Capacity: 80 Annual Energy Generation (Gwh): 209
Name of the Project: Reservoir Chambastan (Rock-fill)Phase 1
Reservoir Volume (Million M3): 800Capacity: 135 Annual Energy Generation (Gwh): 293
Visit: