Skip to main content
Iran Water and Power Resources Development Co.
Main Page
About us
Statements
Company Managers
Projects
Partner Companies
GoAdvanced Search

Prepared Projects for Investment

  Investment

Major Hydropower Projects

Being Operated

  Karun 3

  Karun 4

  Karkhe

  Gotvand

  Masjed Soleiman

Being Executed

  Bakhtiari

  Rudbar Lorestan

  Irrigation and drainage network of Chamshir

  Sarney

  Siahbishe

  Seimare

  Khersan3

Being Studied

  Aras Watershed

  Dez Watershed

  Zohre-Henijan

  North Watershed

  Ghezel Ozan

  Karun Watershed

  Karkhe Watershed

Small and Medium
Hydropower Projects

 Being Operated

 Being Executed

 Ready For Construction

 Ready For Investment

RSS
Modify settings and columns
 Karkhe
Name of the Project: Reservoir Garsha Godar Pir (Rock-fill)Phase 1
Reservoir Volume (Million M3): 1557Capacity: 200Annual Energy Generation (Gwh): 588
Name of the Project: Reservoir Kuran Buran (Rock-fill with clay core)Phase 1
Reservoir Volume (Million M3): 4022Capacity: 284Annual Energy Generation (Gwh): 6388
Name of the Project: Reservoir Tang Mashure (Concrete Double arc)Phase 1
Reservoir Volume (Million M3): 1629Capacity: 167Annual Energy Generation (Gwh): 296
Name of the Project: Reservoir Sazbon (Concrete arc)Phase 1
Reservoir Volume (Million M3): 1600Capacity: 375Annual Energy Generation (Gwh): 572
Name of the Project: Current Karkhe 2 (Weight concrete)Phase 1
Reservoir Volume (Million M3): 132Capacity: 118Annual Energy Generation (Gwh): 205
Name of the Project: Current Sazbon Jadid (Axis 2) (Concrete arc)Reconnaissance
Reservoir Volume (Million M3): 280Capacity: 300Annual Energy Generation (Gwh): 728
Visit: