IWPCo
was established in 1989, aiming to make use of the numerous
potentialities in producing hydropower energy & developing
facilities for water supply, conveyance and storage.
For playing this major role, IWPCo has integrated the decisions
in different fields such as development of hydropower structures
and installations, cooperation in executive management of
projects, increasing national potentialities by development of
non-governmental Engineering & executive sections and ultimate
improvement in management of water and electricity , industry of
the country.
IWPCo has constructed and operated more than 4 powerhouses with
the capacity of about 3200 MW, having 7 powerplant projects
under construction with capacity of 7000 MW to be connected to
national electricity network by the end of 4th national
development plan.
Other power plants with capacity over 16000 MW, are under
studies. |
|
Karkheh dam constructed across Karkheh River, located at Km. 21
of N-E Andimeshk in Khuzestan Province. Karkheh is the biggest
in Iran for its earth-fill dam body volume, the first dam
designed and made by the Iranian, having 60 Km2, the widest
artificial lake in the country.
General Objectives and Characteristics of the Project
- Water supply & control for irrigation of 340,000 acres of
downstream lands
- Control of devastating floods and prevent from relevent
damages
- Hydropower generation
- Dam Type: earth-fill with clay core
- Height above foundation: 127 m.
- Crest length: 3030 m.
- Crest width: 12 m.
- Foundation width: 1100 m.
- Total volume of reservoir: 7.3 billion m3
Spillway Specification
Type: gated chute ogee
Discharge capacity: 18260 m3/s
Power Plant Specification
Average annual generation: 934 GWH
Type: Surface
Capacity: 3x133.3 MW
|
|
|
Karun (3) dam is located at Km. 28 from Izeh city, in N-E of
Khuzestan Province, across the Karun River. It is the highest
concrete dam in Iran now.
After impounding the reservoir of Karun (3) dam and road
disconnection of two provinces of Khuzestan and Chahar Mohal-e-Bakhtiari,
two bridges were constructed on the reservoir of Karun (3) with
336 & 214 m. of span length to reconnect the roads.
General Objectives and Characteristics of the Project
- Control of Seasonal floods of Karun River
- Increase water control for agricultural and drinking purposes
- Hydropower generation
Dam Specification
Dam Type: Double curvature arch concrete dam
Height above foundation: 205 m
Crest length: 462 m
Crest width: 5.5 m
Foundation width: 29.5 m
Total volume of reservoir: 3 billion m3
Spillway Specification
Type: 3 types of ogee-gated-free
Discharge capacity: 13300 m3/s
Power Plant Specification
Type: Underground
Capacity: 2000 MW
Average annual
generation: 4170 GWH
|
|
|
Gotvand Dam and HEPP is located at 25.Km to Shustar town and
near Gotvand city, gotvand dam and HEPP is under construction
across karun river at the downstream of godar-e-landerdam.
Gotvand is the second largest earth-fill dam in Iran, after Karkheh.
General Objectives and Characteristics of the Project
- Hydropower generation
- Control of seasonal floods of Karun River & discharged
water of upper dams
- Control of agricultural downstream water
- Tourism attraction
Dam Specification
Dam Type: rock-fill with clay core
Height above the foundation: 180 m
Crest length: 740 m
Crest width: 15 m
Total volume of reservoir: 4.5 billion m3
Spillway Specification
Type: gated chute ogee
Discharge capacity: 6500 m3/s
Power Plant Specification
Type: Surface
Capacity: 1000 MW, phase I;1000 MW, Extension Phase
(8*250MW in total)
Average annual generation: 4250 GWH
|
|
|
Located at Km. 180, S-W of Shahr-e-Kord city in Chahar-Mohal-e-Bakhtiari Province. Karun(4) is the highest under-constraction dam in
Iran with the height of 230 m.
General Objectives and Characteristics of the Project
- Water Control of the Karun River up to 3.7 billion m3 in year
- Control of devastating floods of Karun River
- Hydropower generation
Dam Specification
Dam Type: Double curvature arch concrete dam
Height above foundation: 230 m
Crest length: 440 m
Crest width: 7 m
Volume of reservoir: 2.2 billion m3
Spillway Specification
Type: 5 free spillways for the first and for 3 gated spillways the second
Discharge capacity of spillways with one bottom outlet: 9200 m3/s
Bottom outlet: two units at elevation of +900
Power Plant Specification
Type: Surface
Capacity: 1000 MW (4x250MW)
Average annual generation: 2107 GWH
|
|
|
Seymareh Dam & Power plant is under construction across Seymareh
River, located at km 37 N-W of Dareh-shahr town.
Dam Specification
Dam Type: Double curvature concrete arch dam
Height above foundation: 180 m
Maximum foundation width: 28 m
Crest length: 202 m
Crest width: 6 m
Total volume of reservoir: 3215 million m3
Spillway Specification
Type: gated radial
Discharge capacity: 6000 m3/5763
Number of gates: 2 unites
Power Plant Specification
Type: surface
Power generation capacity: 480 MW
Average annual generation: 850GWH
|
|
|
Siahbishe project is located at km 125 north of Tehran and km 10
north of Kandovan tunnel on Chalus River. This project has two
upper and lower dams Whenever the electrical consumption is less
than generated energy, the stored water in the lower dam is
pumped to the upper dam, to be used during peak hours of energy
consumption. As in a normal hydro Power Plant, the turbines of
this Power plant generate electricity using the stored water in
upper reservoir.
General Objectives and Characteristics of the Project
- Making balance in power consumption of the national network during peak and light load hours.
- Hydropower generation during peak load hours with a capacity of 1040 MW.
- Consumption of 960 MW of electric energy during light load hours.
- Reduction of depreciation costs of thermal power plants up to USD 19 million in year.
|
|
|
Dams Specification
Upper Dam
Dam Type: rock-fill with concrete face
Height: 86.5 m.
Crest length: 497 m.
Crest width: 12 m.
Volume of reservoir: 3.6 million m3
Type of spillway: free stepped spillway
Discharge capacity: 203m3/s
Lower Dam
Dam Type: rock-fill with concrete face
Height: 104 m.
Crest length: 330 m.
Crest width: 12 m.
Volume of reservoir:
3.7 million m3
Type of spillway:
free stepped spillway
Discharge capacity:
860m3/s
Power Plant Specification
Type: Underground
Power generation capacity: 1040 MW
Power consumption capacity: 960 MW
|
|
|
Located at Km. 100 south of Aligoudarz city in Lorestan
Province.
General Objectives and Characteristics of the Project
- Roudbar-e-Lorestan Dam & Power plant is under construction
across Roudbar River.
- Utilizing topographic potentialities of the region for
hydro power generation from Rudbar River and Alkan River.
Dam Specification
Dam Type: Roller compacted concrete
Height above foundation: 158 m.
Crest length: 211m.
Crest width: 8m.
Total volume of reservoir: 228 million m3
Spillway Specification
Type: Free-stepped and chute gated spillway
Discharge capacity: 2900 m3/s.
Power Plant Specification
Type: surface
Installed capacity:450 MW
Average annual generation : 986 GWH
|
|
|
Parallel to construction of large hydro power plants such as
Karun3, Masjed soleiman and Karkheh; IWPCo has started
construction of small and medium sized hydro power plants and
development of run-off-river Power plants; based on country wide
potentialities by using of modern methods.
-
Having unique specifications of run-off-river type Power Plants
such as:
-
short time for construction
-
having less environmental problem
-
having reasonable economic aspects
-
having numerous potentialities all over the country
-
being appropriate for transferring know-how and technology
-
being appropriate for investment by private sector made them
attractive to be considered for investment.
Projects in operation
| Pol-Kolu |
4 4 MW (Kohgiluyeh & Boyer-Ahmad
province) |
| Kouhrang |
35 MW (Chahar Mohal-va-Bakhtiari
province) |
| Dareh Takht (1) & (2) Micro plants |
1.58 MW (Lorestan province ) |
| Micro Hydropower Plants |
227 Kw (Provinces of Gillan,
Ardabil,
Khorasan Razavi) (Nav-Maran-Darjan-Karnagh-Gorni) |
|
|
|
Projects under construction
| Lavarak underground Project |
47 MW (Tehran province) |
| Yasouj chain Project Shahid Rajaee
dam & |
10.3 MW (KohKiluyeh & Boyer Ahmad
province) |
| Power plant |
13.5 MW (Mazandaran Province) |
| Pinan |
7.2 MW (at tender) (Kermanshah
Province) |
Projects Prepared for construction
| Dez-regulation dam |
28 MW (Khuzestan Province) |
| Tarrik (Sefidrood) |
2.8 MW(Gilan Province) |
| Zayandehrood |
8.5 MW (Isfahan Province) |
| Kohgiluyeh & Boyer 1 |
135 MW |
| Ardal package |
20.76 MW (Chahar Mohal-e-Bakhtiari) |
| Yasouj development |
4.5 MW (Kohgiluyeh& Boyer Ahmad) |
|
|
|
Bakhtiary dam and power plant will be constructed at the north part of
Bakhiary river in Lorestan Proveince. With the height of 315m.
it would be the highest dam in the world after construction.
General Objectives and Characteristics of the Project
- Hydropower generation
- Increasing useful life time of Dez dam
and Hpp by blocking sediments pouring into Dez reservoir
- Control of devastating floods and
prevention of annual destruction and contributing to secure
situation in down stream
Power Plant Specification Type: Underground
Capacity: 1500 MW
Annual generation average: 2984 GWH Dam Specification
Dam Type: Double curvature arch concrete dam
Volume of reservoir: 4.8 billion m3
Maximum foundation
width: 50 m.
Crest length: 434 m.
Crest width: 6 m.
Height above foundation: 315 m.
Spillway Specification
Type: tunnel gated
Discharge capacity: 5700 m3/s.
|
|
|
Aiming to fulfill IWPCo
objectives, "Technical and planning deputy" and "Development
Projects" are developing hydropower potentialities using
three methods of dam construction, i.e. storage, run-off-the
river and pumped storage as well as projects for conveyance
of water.
Therefore in all over the country, the rivers and their
catchment-areas have been considered for different phases of
studies.
More than 24 dam sites (For construction of large Power
Plants), about 200 dam sites (for construction of small and
medium-sized Power Plants) and several water conveyance
directions have been studied for reconnaissance, feasibility
and detailed design studies.
Other project studies such as:
-
GIS software installation,
-
Flood alarm system software installation,
-
Catchment areas studies,
-
Impounding of Karkheh River, etc. are being performed,
aiming to serve other projects either under construction or
under studies.
|
|
|
|
Storage Dam |
Reconnaissance |
Qezel ozan basin |
1055 |
The capacity figures in this phase are approximate. |
| Zohreh basin |
250 |
| Garsha-Godar peer |
220 |
| Phase 1 |
Zalaky |
470 |
|
| Liroo |
340 |
|
| Khersan 2 |
580 |
|
| Khersan 1 |
390 |
|
| Bazoft |
240 |
|
| Kooran buzan |
280 |
|
|
Sar dasht |
150 |
|
| Phase 2 |
Khersan 3 |
300 |
|
| Bakhtiary |
1500 |
|
| Sazbon |
375 |
The Previous axis |
| Run-off-river Dam |
Reconnaissance |
New sazbon axis 2 |
300 |
Run-off the River axis |
| Medium & small |
988 |
118 units |
| Phase 1 |
Arass |
270 |
130 MWs has been
considered in Armenia territory |
| Karun II |
1000 |
The 8th axis with
increasing the capacity and in run-off-river type |
| Sezar\Dez |
800 |
|
| Karkheh II |
200 |
|
| Medium& Small |
194 |
100 units |
| Phase
2 |
Nemarostagh |
31.4 |
Chain 2 units |
| Sard Abroud |
18.9 |
Chain 4 units |
| Aziz abad-Absard &Douplan |
20.8 |
|
| Nari |
2.5 |
|
| Souleh Dakal |
15.8 |
|
| Ziv keh |
14.6 |
|
|
Pumped storage power plants |
Reconnaissance |
Whole country |
5000 |
In reconnaissance phase at least 15000 MWs have been
studied
and 5000 MWs would be
selected as maybe needed in
network. |
| Phase 1 |
Illam |
1000 |
|
| Water Transmission |
Phase 1 |
Tangeh mashooreh |
166 |
|
| Project studies |
|
|
|
9 Projects |
|
|
|
|
|