|
Achievements of IWPCo till 1386:
1. providing,
transferring and reserving water
2. Clean electrical power generation from the renewable
resources
3. Controlling destructive floods
4. Agricultural splendor
5. Technology transfer and local construction, implementation
and execution
6. Developing Technical–engineering capacity of local
consulting companies and contractors
7. Regional development
8. Training managers and experts and man power development in
each phase of project implementation
9. Environmental results coming from not using fossil fuels in
energy generation
10. Prudence resulted from not using fossil fuels
11. Contribution for network stability
In the following, each of the above topics
is described:
1. providing, transferring and
reserving water
• IWPCo is studying and implementing projects with the aim of supplying and
providing water needed for different kinds of consumption, besides the
hydropower Energy generation. In this regard, supplying more than 40 billion
m3 of water has been studied and is in the process of execution.

In the following graph, the
status of water resources supply by the projects of IWPCo is presented:

2. Clean electrical power generation
from the renewable resources
IWPCo has in process of study, execution and operation of totally a capacity
of 26000 MW hydropower power-plants, which are shown in the following table.
Generating a capacity of 4000 MW is achieved by completed projects of IWPCo.

Also in the following figure, the process of capacity growth of hydropower
power-plants in the country is clearly shown.

3. Controlling destructive floods
Constructing different dams by IWPCo has controlled destructive floods such
as Karkheh, Karun and Dez Rivers floods with billions of cubic meters annual
volume. It should be noted that before these actions, because of lack of
ability in flood controlling and the life loss damages, billions of Rials
had been lost annually for the damages to the farms and gardens,
infrastructure equipments, residential units, etc.

In this regard it can be mentioned that before construction of Karkheh Dam,
annually the average of more than 50 billion Rials of damages resulted from
floods had been reported in this region. Controling the floods of this river
and preventing from repetition of the mentioned damages
over the main achievements of IWPCo. After operation of Karun 3 dam in
Karun River, a flood with the discharge of 13000 m3/s was controlled in
2005. Damages estimation of this flood –if it were not controlled- has been
calculated and is shown in the following table:
|
Maximum entrance flood to Karun 3 River (m3/s) |
Maximum exit flood from Karun3 River (m3/s) |
Decrease of estimated damages (Billion Rials) |
|
13000 |
5000
|
350 |
4. Agricultural splendor

Reserving big volumes of entering water to the dam reservoirs constructed
by IWPCo has made it possible to irrigate thousands of hectares of
agricultural fields. Considering the development of Dez and Karun regional
agricultural fields, the following points show the importance of this
strategic achievement:
1. Total potential of cultivatable lands of Karun and Dez regions are
500 thousand hectares. (Dez region 200 and Karun region 300 thousand
hectares)
2. Existing agricultural and under cultivation fields of these two
regions is about 300000 hectares.
3. There is possibility of developing 50000 hectares of agricultural
fields with operation of Karun 3 dam.
4. There is possibility of developing all potentials of agricultural
fields (500000 hectors) after operation of all dams in this region which are
now in the stages of construction or feasibility studies.
5. There is possibility of using 85% of the water potentials of this
region, in case all these dams are completed.

In Karkheh region also the following points show the importance of this
achievement:
6. Agricultural potential of down-stream lands of Karkheh dam is about
355000 hectares.
7. Agricultural potential of up-stream lands of Karkheh dam is 40000
hectares.
8. Developed lands after operation of Karkheh dam will become 260000
hectares.
9. There is possibility of developing a considerable part of upstream
lands after operation of Tang Mashore dam.
10. Karkheh agricultural fields can be developed to 100% and 95% of the
existing potential; in two scenarios of cultivating patterns according to
the existing water resources..
11. There is possibility of using 85% of the water potentials of this
region, in case of complete development.

5.Technology transfer and local
construction, implementation and execution
IWPCo has been able to increase and develop
the client capacities in designing and supervising different hydropower
projects and boost the capacities of local consultants for proper execution
of projects, while increasing local contractor potentials. With these
efforts now the country has reached to 100% of its potential to implement
the dam and power plant projects and 70% of its potential to manufacture
required equipments locally.


6.
Developing
Technical–Engineering Capacity
of Local Consulting Companies and Contractors
During recent years, IWPCo has benefited
from the cooperation of local contractors and consultants. Due to this
matter it has prevented big amounts of payments to foreign contractors and
consultants. This matter has also resulted in growth of scientific and
technological abilities of local consultants and contractors and has created
variety of jobs in this field.
7. Regional development
• Creating tens of thousands
of occupational opportunities in different sections

• Establishing a tourism
center and providing the possibility of expanding the tourism and fishery
industry

• Supplying water and
irrigating the regions where the project is implemented
  
• Supplying electricity to
the project region

8. Training managers and experts and
man power development in each phase of project implementation
9. Environmental results coming from
not using fossil fuels in energy generation
Recently in discussions related to the
energy, fundamental issues such as optimum usage of the energy for avoiding
environment pollution are considered. In this regard according to the
carried out estimations, in the present time environmental expenses
resulting from generating each kilowatt/h of electricity by the thermal
power plants considering its social, environmental and economical loss is
almost 1.8 cent. Considering this matter, one of the main achievements of
IWPCo is saving billions of Rials annually, which is gained by generating
clean energy.

The amount of these savings in 2006,
according to generation of 18000 million Kilowatt/h of electricity is
estimated about 3000 billion Rials which will have an ascending procedure in
future years.
10. Prudence resulted from not
using fossil fuels
Regarding the fossil fuels resources
limitations in the world and considerable increasing of the fuel price and
considering the point that hydropower plants -as one of the main
generators of clean energy- does not need fossil fuels; one of the other
important achievements of IWPCo is national prudence resulted from this
issue, in a way that only at the end of 2006, hydropower plants of
the country, generating 18000 million kilowatt/ h of electricity and without
using any fossil fuel have saved 7500 billion Rials. With expansion the
hydro electric power plants in the future, we are expecting more savings in
this field.
   
11. Contribution for network
stability
Network frequency controlling is usually
done through hydropower plants. At the present time, besides Dez
dam power plant, Karun 3 dam power plant is also used for this purpose and
due to the possibility of rapid entrance of these types of power plants into
the circle, sudden changes are controlled with their entrance or exit.
|